Generator Faults & Failures

Grid Challenge

Generator Faults

or

Failures

$1.3M

+

for every month offline

CAN COST

utilities

IN LOST REVENUE

40% of faults

can be attributed to

issues

with a

generator’s stator

or

rotor

56% of failures

can be attributed to

insulation

degradation

from aging and wear

An average

50MW generator

takes

more than

6 months to commission